Power was restored at 6:09 a.m. on Saturday to consumers affected by a technical failure in the power generation system, according to the Cyprus Transmission System Operator (CSTO).
In a statement, the CTSO reported that the failure occurred at 5:51 a.m. in “Area B,” within the occupied areas, resulting in the shedding of consumer load in various areas of Cyprus.
Source: CNA
Advertisement